Dolly Varden recently completed a 10,000-meter diamond drill program that was essentially split 65/35 between resource expansion and infill drilling at the Torbit deposit. The labs in BC have been a bit delayed, which is not entirely uncommon this time of year, but results could finally start trickling in as early as the first week of December.
Torbrit is considered a high-grade silver deposit that’s potentially amenable to low-cost underground bulk mining methods. It also represents the largest portion of the four silver deposits that make up the current 43-101 Mineral Resource [32.9 million ounces Ag Indicated plus 11.4 million ounces Ag Inferred] — making Dolly Varden Canada’s largest pure-play silver project.